Today we discussed and corrected the 3.2 Water Erosion GRS. The students also were either paired or placed into groups. The pairs/groups began to sketch out a design for their water erosion/deposition display.
Tuesday, February 2, 2010
Subscribe to:
Post Comments (Atom)
Blog Archive
- ▼ 2010 (984)
- ► 2009 (1417)
No comments:
Post a Comment